ALIF-1 Brief History
12-09-2022• The well drilled by X-company YHOC in the eightees
• Well Handled & operated by the national Oil Company SAFER in 2005
• The name Alif came from the first letter of AL-Yemen
• Alif-1 is the first well Drilled in Yemen
• Well was Spudded & Drilled in January 31, 1984 as an Exploration well
• The Well was drilled to a total depth of 13720 feet into the Basement
• 30” conductor casing 131 feet
• 20” conductor casing 879 feet
• 13-3/8” surface casing 3482 feet
• 9-5/8” production casing 9609 feet
• The well was drilled in 200 Days
• Drilling the well costs $13,000,000
• The well completed as Gas Injection Well in 1988
• Total gas Injected into the well 533 Billion SCF
• The well was Plugged for Abandonment due to corroded casings & bad integrity in October 15, 2014.